top of page
Desbordamiento del alcantarillado

PROJECTS OF
STORM DRAIN

CONFIRMED PROFESSIONAL EXPERIENCE

Experience in storm drainage projects includes design. The primary tool used in the designs is Bentley System's Open Flow SewerGEMS software.

2015

Year of establishment

+10

Completed Projects

+10

Satisfied companies

1

Project: Storm drainage design for the overpass at the Carretara Sur-Pista Suburbana-Managua intersection, Nicaragua

Post:Hydraulic Specialist

Employer: VIELCA-CPS Consortium

Start date: 04/17/2023   _cc781905-5bb6bad5c5-31b5c5 d_Final date:Current

Contract: MHCP–CGPP–CC–05-2022

Funding Source: N/A

Main activities and responsabilities:

  • Existing storm drainage survey

  • Hydrological study with the rational method

  • Storm drainage design of the intersection.

2

Project: Storm drainage design for the overpass at the Carretera Vieja a León-El Crucero intersection.

Post:Hydraulic Specialist

Employer: VIELCA-CPS Consortium

Start date: 25/10/2022   _cc781905-5bb6bad5c5-31b5c5 d_Final date:04/14/2023

Contract: MHCP–CGPP–CC–05-2022

Funding Source: N/A

Main activities and responsabilities:

  • Existing storm drainage survey

  • Hydrological study with the rational method

  • Storm drainage design of the intersection.

3

Project: Storm drainage design for the Altos de Motastepe urbanization Stage 4. Ciudad Sandino, Managua.

Post:Hydraulic Specialist

Employer: PROHISA

Start date: 02/01/2023 Final date: Current

Contract: N/A

Funding Source:N/A

Main activities and responsabilities:

  • Hydraulic design and construction plans of the urban storm drainage system of the fourth stage of the urbanization, modeled with the SewerGEMS CONNECT EDITION UPDATE 2 software. The design must meet the criteria established in the minimum drainage standards of the city of Managua._cc781905- 5cde-3194-bb3b-136bad5cf58d_

4

Project: Storm drainage design for the Altos de Motastepe urbanization Stage 3. Ciudad Sandino, Managua.

Post:Hydraulic Specialist

Employer: PROHISA

Start date: 02/01/2022 Final date: 12/16/2022

Contract: N/A

Funding Source: N/A

Main activities and responsabilities:

  • Hydraulic design and construction plans of the urban storm drainage system of the third stage of the urbanization, modeled with the SewerGEMS CONNECT EDITION UPDATE 2 software. The design must meet the criteria established in the minimum drainage standards of the city of Managua._cc781905- 5cde-3194-bb3b-136bad5cf58d_

5

Project: Design of urban storm drainage of the Villa Madrid urbanization. Belen-Rivas

Post:Hydraulic Specialist

Employer: CONSERVICES

Start date: 01/17/2020 Final date: 8/02/2020

Contract: N/A

Funding Source:N/A

Main activities and responsabilities:

  • Hydraulic design and construction plans of the urban storm drainage system of the urbanization, modeled with the SewerGEMS CONNECT EDITION UPDATE 2 software. The design must meet the criteria established in the minimum drainage standards of the city of Managua._cc781905-5cde-3194- bb3b-136bad5cf58d_

bottom of page