SANITARY SEWER

CONFIRMED PROFESSIONAL EXPERIENCE

Experience in sanitary sewer projects includes design and/or construction. The primary tool used in the designs is Bentley System's Open Flow SewerGEMS software.

1

Project: Construction of the Sanitary Sewerage and Wastewater Treatment System for the Moyogalpa and Altagracia Towns. (Moyogalpa Sanitary Sewerage and Wastewater Treatment System – Lot 1).

Post:Hydraulic Specialist

Employer: Euskabea-Girder Consortium

Start date: 29/10/2020   _cc781905-5bb6bad5c5-31b5c5 d_Final date:04/30/2022

Contract: AL-435-09-2020

Funding Source: Inter-American Development Bank (IDB)

Main activities and responsabilities:

  • Redesign the conventional sanitary sewer system of the city of Moyogalpa, Isla de Ometepe- Department of Rivas, Nicaragua (11.4 km of drainage pipes)

  • Hydraulic review of the wastewater treatment plant, WWTP (Pretreatment-Tank Imhoff-Humedales-LU).

2

Project: Construction of the Sanitary Sewerage and Wastewater Treatment System for the Moyogalpa and Altagracia Towns. (Altagracia Sanitary Sewerage and Wastewater Treatment System – Lot 2).

Post:Hydraulic Specialist

Employer:Euskabea-Girder Consortium

Start date: 28/10/2020 Final date:04/30/2022

Contract:AL-436-09-2020

Funding Source:Inter-American Development Bank (IDB)

Main activities and responsabilities:

  • Redesign the conventional sanitary sewer system of the city of Altagracia, Isla de Ometepe- Department of Rivas, Nicaragua (13.3 km of drainage pipes)

  • Hydraulic review of the wastewater treatment plant, WWTP (Pretreatment-Tank Imhoff-Humedales-LU).

3

Project: Improvement and expansion of the sanitary sewer system of Ciudad Darío, department of Matagalpa.

Post:Hydraulic Specialist

Employer: DYSCONCSA-DOWHA Consortium

Start date:03/09/2019    Final date: 10/04/2019

Contract: MHCP-CGPP-FP-02-2017

Funding source: Nicaraguan State Treasury

Main activities and responsabilities:

  • Final design of Ciudad Darío sanitary sewerage: 50 km of sanitary sewerage network, 767 manholes and 8 pumping stations.

4

Project:Improvement and expansion of the sanitary sewer system of Las Calabazas, department of Matagalpa

Post:Hydraulic Specialist

Employer: DYSCONCSA-DOWHA Consortium

Start date: 10/13/2018   Final date: 11/28/2018

Contract: MHCP-CGPP-FP-02-2017

Funding Source: Inter-American Development Bank (IDB)

Main activities and responsabilities:

  • Sanitary sewerage design Las Calabazas Community: 10.32 km of sanitary sewerage network, 193 manholes and 3 pumping stations.

5

Project:Design and construction of the tertiary treatment of the Masaya wastewater treatment plant

Post:Hydraulic Specialist

Employer: BYUCKSAN POWER

Start date: 06/11/2020   Final date: 04/04/2021

Main activities and responsabilities:

  • Evaluation of the WWTP effluent discharge drive line

  • Design of pumping station and discharge line for tertiary treatment sludge

6

Project:Sanitary sewerage design for the Altos de Motastepe urbanization Stage 3

Post:Hydraulic Specialist

Employer: BRINCOSA

Start date: 02/15/2021   Final date: 04/14/2021

Contract: N/A

Funding source: Private investment

Main activities and responsabilities:

  • Hydraulic design and construction plans of the conventional sanitary sewer system to collect wastewater from 162 lots in the urbanization, modeled with the SewerGEMS CONNECT EDITION UPDATE 3 software. The design must meet the criteria established in the INAA sanitary sewer design manual . 