CONFIRMED PROFESSIONAL EXPERIENCE
Experience in potable water projects includes design and/or construction. The primary tool used in the designs is Bentley System's Open Flow software WaterGEMS and Hammer.
2015
Year of establishment
+10
Completed Projects
+10
Satisfied companies
1
Project:Studies and Designs of the Project "Improvement and Expansion of the Drinking Water and Sanitary Sewerage Systems and Wastewater Treatment of the City of Jinotega, Department of Jinotega"
Post:Hydraulic Specialist
Employer: VIELCA-MEDIOTEC Consortium
Start date: 01/17/2022 Final date:Current
Contract: MHCP-CGPP- FP-CC- 01-2021
Funding Source: Pre-investment funds of the Government of the Republic of Nicaragua
Main activities and responsabilities:
-
Hydraulic modeling of pumping stations in catchment and drive lines
-
Hydraulic modeling of drinking water distribution networks
2
Project:Improvement and Expansion of the drinking water system of the city of Nueva Guinea
Post:Hydraulic Specialist
Employer:Energy Lindman Enterprises Corp.
Start date: 11/30/2021 Final date:12/30/2022
Contract:AL-082-02-2021.
Funding Source:European Investment Bank
Main activities and responsabilities:
Hydraulic design review of:
-
Surface source collection work
-
Raw water pumping station
-
Collection impulsion line-PTAP
-
PTAP Rehabilitation
-
WWTP pumping station
-
Drive line PTAP-Storage tanks
-
Storage tanks
-
Drinking water distribution networks.
3
Project:Construction of the Improvement and Expansion of the Collection Works, Tanks and Treatment Plant of the Drinking Water Systems of the Towns of Moyogalpa and Altagracia
Post:Hydraulic Specialist
Employer: BYUCKSAN-EUSKABEA Consortium
Start date:04/11/2020 Final date:04/30/2022
Contract: AL-666-12-2020
Funding source: Inter-American Development Bank (IDB)
Main activities and responsabilities:
-
Hydraulic redesign of the raw water impulsion line in the town of Altagracia
-
Hydraulic redesign of the raw water impulsion line in the town of Moyogalpa
-
Hydraulic revision of the water treatment plant (CEPIS TYPE) in the town of Altagracia
-
Hydraulic revision of the water treatment plant (CEPIS TYPE) in the town of Moyogalpa.
4
Project:Construction of the Improvement and Expansion of the Drinking Water Network System of the Towns of Moyogalpa and Altagracia” Lot No. 1: Moyogalpa Drinking Water Distribution Networks.
Post:Hydraulic Specialist
Employer: EUSKABEA-GIRDER Consortium
Start date:09/29/2020 Final date:04/30/2022
Contract: AL-437-09-2020
Funding Source: Inter-American Development Bank (IDB)
Main activities and responsabilities:
-
Hydraulic redesign of drinking water networks in the town of Moyogalpa from PVC to HDPE pipes.
5
Project:Construction of the Improvement and Expansion of the Potable Water Network System of the Towns of Moyogalpa and Altagracia” Lot No. 2: Altagracia Potable Water Distribution Networks.
Post:Hydraulic Specialist
Employer: EUSKABEA-GIRDER Consortium
Start date:09/29/2020 Final date:04/30/2022
Contract: AL-438-09-2020
Funding Source: Inter-American Development Bank (IDB)
Main activities and responsabilities:
-
Hydraulic redesign of drinking water networks in the town of Altagracia from PVC to HDPE pipes with the WaterGEMS Connect EDITION software.
6
Project:Construction of the Improvement and Expansion of the Drinking Water Network System of the Towns of Moyogalpa and Altagracia” Lot No. 1: Moyogalpa Drinking Water Distribution Networks.
Post:Hydraulic Specialist
Employer: EUSKABEA-GIRDER Consortium
Start date:09/29/2020 Final date:04/30/2022
Contract: AL-437-09-2020
Funding Source: Inter-American Development Bank (IDB)
Main activities and responsabilities:
-
Hydraulic redesign of drinking water networks in the town of Moyogalpa from PVC to HDPE pipes.
7
Project:Studies and design of the improvement of the drinking water and sanitary sewerage system of the city of Camoapa
Post:Hydraulic Specialist
Employer: Hydraulic Civil and Environmental Engineering (ICA)
Start date: 06/03/2020 Final date: 06/26/2020
Contract: AL-076-03-19
Funding Source: Central American Bank for Economic Integration (CABEI)
Main activities and responsabilities:
-
Hydraulic design of drive lines and pumping stations of Piedra Colorada-Camoapa (23 km)
-
Hydraulic design of drive lines and pumping station Rocas Morena-Camoapa (12 km)
-
Hydraulic design of Mombachito-Camoapa gravity drive lines. (8.5 km).